DIVISION 31 – EARTHWORK

DIVISION 31 – EARTHWORK

31 00 00 08/08 EARTHWORK
31 05 19 08/08 GEOTEXTILE
31 05 20 08/08 GEOSYNTHETIC DRAINAGE LAYER
31 05 21 08/08 GEOGRID SOIL REINFORCEMENT
31 05 22 08/08 GEOTEXTILES USED AS FILTERS
31 10 00 08/08 CLEARING FOR CIVIL WORKS
31 11 00 08/08 CLEARING AND GRUBBING
31 21 00 08/08 PIPING; OFF-GAS
31 21 13 08/11 RADON MITIGATION
31 23 00.00 20 02/11 EXCAVATION AND FILL
31 31 16.19 04/06 TERMITE CONTROL BARRIER SYSTEM
31 31 16.20 04/06 BASALTIC TERMITE BARRIER
31 31 16.21 08/08 MESH TERMITE BARRIER
31 31 16 08/08 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
31 32 11 08/08 SOIL SURFACE EROSION CONTROL
31 32 23 08/08 FOUNDATION DRILLING AND GROUTING
31 32 39 08/08 BIOENGINEERING PRACTICES FOR STREAM BANK AND SHORELINE STABILIZATION
31 36 00 08/08 WIRE MESH GABIONS[ AND MATTRESSES]
31 41 16 08/09 METAL SHEET PILING
31 60 00 11/08 FOUNDATION PREPARATION
31 62 13.13 04/06 CAST-IN-PLACE CONCRETE PILES
31 62 13.20 08/09 PRECAST/PRESTRESSED CONCRETE PILES
31 62 13.24 08/11 CONCRETE CYLINDER PILES
31 62 13.26 04/06 PRESSURE-INJECTED FOOTINGS
31 62 16.16 11/11 STEEL H-PILES
31 62 19.13 04/06 WOOD MARINE PILES
31 62 19 01/08 TIMBER PILES
31 62 21 11/08 PILING: COMPOSITE, WOOD AND CAST IN-PLACE CONCRETE
31 62 23.13 11/08 CAST-IN-PLACE CONCRETE PILES, STEEL CASING
31 63 16 11/08 AUGER CAST GROUT PILES
31 63 26 08/08 DRILLED CAISSONS
31 63 29 05/09 DRILLED CONCRETE PIERS AND SHAFTS
31 68 13 11/08 SOIL AND ROCK ANCHORS
31 73 00 11/08 TUNNEL AND SHAFT GROUTING